Our Projects
Public Works Department (PWD) Maharashtra, Hybrid Annuity Mode (HAM) Projects
- PN-35, Construction of two lane highway for improvement of Ashtavinayak Road District Pune connecting Narayangaon, Otur, Bunkar Phata, Lenyadri, Ozar and Ganeshkhind with length of flexible pavement 54.257 km and 0.27 km of rigid pavement (total length 54.527 km). 07 Minor Bridges, 111 Culverts.










- PN-27, Construction of Two Lane Highway in industrial area of District Pune Hinjewadi, Chakan, Talegaon, Ranjangaon & Jejuri Rigid Pavement length 31.388km and flexible pavement 17.541km (Total length 48.929 km). 5 Minor Bridges, 107 Culverts.










- Package PN-163, Construction of Six lane Highway of Existing four lane part of Pune-Ahmednagar road connecting to Pune, Shirur, Shikrapur Flexible pavement length 24.700 Km. 02 Major Bridges, 08 Minor Bridges, 39 Culverts





Central Railway Panvel, maharashtra (JNPT) project
- Construction of 5km Earthwork work for the Railway track, 1 Minor Bridge span configuration 3X4.5 width 80m, 18 Box Culvert span configuration 1X2X2 width 80m each, 1 Multistorey Service Building floor G+5 in New Holding Yard of Jawaharlal Nehru Port Trust (JNPT) in connecting with Dedicated Freight Corridor (DFC) alignment








Public works department (PWD) Bridges works projects
- Construction of New RCC Foundation and substructure & PSC solid spine slab Major Bridge span configuration 6X22.50m width 7.950m (Total length 135m) across Ghod river village Annapur Tal. Shirur Dist. Pune Maharashtra
- Construction of New RCC Foundation and substructure & PSC solid spine slab Major Bridge span configuration 6X25.00m width 7.950m (Total length 150m) across Ghod river village Kavathe Tal. Shirur Dist. Pune Maharashtra






MIDC COMPLETED PROJECT
- Rajiv Gandhi Infotech Park At Hinjewadi – Maan Providing Final Aspaltic Treatment To Road From Chande Phata To Ghotawade Phata(Ch 0.00 To 2.40)



National Highways Authority of India (NHaI) Projects
- Construction of 4 Laning National Highway Road Project under Bahratmala Pariyojana on Betul - Khandwa section in the state of Madhya Pradesh Flexible pavement for main carriageway length 28.680 Km , 02 New construction Rail Over Bridge (ROB) span 1X58 width and 1X37.50 width 12.50 each, 02 Minor Bridges span configuration 1X10m and 1X25m 03 New construction Vehicular under pass (VUP) span configuration 1X12mX5.5m and 2X22.25mX5.5m, 02 New construction light vehicular under pass (LVUP) Span configuration 1X12mX4m, 02 New Small vehicular underpass (SVUP) span configuration 1X7m, New 09 Box Culvert and 04 Pipe culvert.
- Repair work of 4 laning NH-59 BOT Road project from Indore to Dhar section of Indore Gujarat MP Border on BOT Toll basis for length 108Km in the State of Madhya Pradesh under National Highways Development Project (NHDP) Phase
- Maintenance work of NH-09 Tiger Corridor Road Project of Flexible pavment length 21km on Itarsi-Betul Section in the state of Madhya Pradesh
- Rectification of Black Spot – Mansar Morh for 0.91 Km in district Samba in union territory of Jammu and Kashmir on EPC Mode



Talegaon Nagarparishad Com leted Project
- Talegaon Dabhade Nagarparishad Sports Complex
- Proposed Muncipal Shopping centre In site No .26 AT C.T.S. No.4851(P)& C.T.S. No.7100(P) S.No.356 (Old S.no.625) For Talegaon Dabhade Muncipal Council



